🌱 Someday / Maybe

Ideas that are NOT active commitments but worth keeping. Review monthly during Weekly Review.

Overview

If an idea becomes actionable β†’ move to TASKS-Active.


πŸ“š Research Extensions (Post-PUMA Project)

  • Add Stage 3: Backlog prioritisation (Spearman correlation β‰₯ 0.50)
  • Add Stage 4: RAG-enhanced triage (retriever + classifier)
  • Add Stage 5: Full Smart PMO multi-agent system (CrewAI or LangGraph)
  • Extend to 5-class priority schema (Critical/High/Medium/Low/Trivial)
  • Fine-tune Llama 3.2 on Jira SR for comparison with zero-shot
  • Add fairness metrics (measure bias across project types)
  • Test on non-English issue trackers (GitLab, Azure DevOps)
  • Publish PUMA results as academic paper (target: MSR 2027 or EASE 2027)
  • Create a live PUMA leaderboard (Hugging Face Spaces)

πŸ› οΈ Tooling Ideas

  • Build Streamlit UI for interactive PUMA triage demo
  • Create GitHub Action for auto-running benchmark on new model releases
  • Add model-as-a-judge evaluation (use LLM to score LLM output quality)
  • Integrate Arize Phoenix for full LLM observability in Stage 4+
  • Try Pydantic AI for enforced structured output (replace regex parsing)

πŸ“– Learning Topics (Post-PUMA Project)

  • Deep dive: Fine-tuning LLMs (LoRA, QLoRA) β€” is it worth it for PM tasks?
  • Learn LangGraph deeply (multi-agent coordination patterns)
  • Study: AI fairness and bias measurement (Barocas, Hardt, Narayanan book)
  • Explore: Program synthesis for automated spec generation (SDD extension)

πŸ’‘ Open Questions Worth Investigating

  • Does model size (3B vs 7B vs 13B) matter more than prompting strategy for triage?
  • Can PUMA be adapted for non-Jira issue trackers (GitHub Issues, Linear)?
  • What is the minimum training data needed to fine-tune a model to match CoGEE?
  • Does chain-of-thought improve or degrade estimation for Fibonacci-scale outputs?


id: WAITING-Log title: ”⏳ Waiting For β€” PUMA” type: gtd-waiting tags: [gtd, waiting, blocked] created: 2026-03-01

⏳ Waiting For

Items where progress depends on someone/something else. Review weekly.

ItemWaiting forSinceFollow-up date
Tutor feedback on Ch.1Dr. [Tutor name]2026-03-082026-03-15
Jira SR full dataset download confirmationZenodo (zenodo.org)2026-03-04Verify SHA256
TAWOS dataset downloadGitHub SOLAR-group2026-03-04βœ… Done
Ollama v0.5+ release (seed API fix)Ollama projectTBDCheck monthly


id: PROJECTS-Master title: β€πŸ“‹ Projects Master List β€” GTD” type: gtd-projects tags: [gtd, projects, master] created: 2026-03-01

πŸ“‹ Projects Master List

All active multi-step projects. Each must have a clear next action.

ProjectNext ActionDeadlineNote
PUMA Project β€” Ch.2 LiteratureRun SLR search on arXiv2026-04-08PR-PUMA-Ch2-Ch3-Ch4-Ch5
PUMA Project β€” Triage ModuleWrite SP-Triage-Agent-v1 spec2026-04-08SP-Architecture
PUMA Vault β€” GitHubSet up git remote2026-03-06README
Zotero LibraryImport 6 verified papers2026-03-0820 - Literature
Ollama EnvironmentPull Mistral 7B + verify2026-03-05LN-Tools-Ollama-ClaudeCode-OpenCode-BrowserOS